*CURRENTLY IN PRE-CONSTRUCTION* The seismic strengthening for the Dufur K-12 School Phase II Seismic Rehabilitation. The building portion in scope, the south wing, consists of a single-story, masonry and wood structure built in 1956, covering 22,250 square feet. The south wing includes classrooms and a library. The intent is to strengthen the building to an Immediate Occupancy (Seismic Risk Category IV) seismic performance level.
New 12,937SF community library (with a 920SF mechanical mezzanine) for the city of Washougal. Facility includes common public areas for adult, teen, and children's spaces consisting of book stacks, reading areas, activity areas, a flexible community room, and smaller meeting & study rooms. Also included are administrative offices and staff support spaces. Bids Due: 9/1/26 @ 10:00am Job Walk: 8/6/26 @ 2:00pm | 222 Durgan St. Washougal, WA | (*Only mandatory for General Contractors) Project Duration: 10/2026 - 12/2027 (*Strict Deadline)
Plans + Specs + Addendum 1 + Addendum 2 + Addendum 3 + Addendum 4 +
Ground up Cafeteria addition including required demolition, on-site & earthwork construction, general construction, general renovation construction, mechanical, plumbing, electrical & data & technology work. Prevailing wages apply.
Plans + Specs VOL 1 + Specs VOL 2 + Lighting Cutsheets + Offsites + Addendum #1 + Addendum #2 + Addendum #3 +
This project will expand the existing Warm Springs Health and Wellness Center by 18,000 square feet, and renovate 7,500 square feet of the existing health clinic. This project is to be done in two phases per drawings. Important Items to note: Federally Funded Project Buy American Act Required Davis Bacon Wages (see wage determinations provided) Phase 1 (Addition and sitework) - 372 Calendar days Phase 2 (Remodel) - 180 Calendar days Project Start - September 2025
Plans + Specs VOL 1 + Specs VOL 2 + Temp Lab Specs + Door Schedule + Visio-Temp Lab Layout + Pharmacy Security Camera Requirements + J11 FFE Schedule of New Fixed Equipment + J12 FFE Schedule of New Fixed Furniture + J18 Health and Wellness Center Modernization - Interior Finishes Boards + J23 Health and Wellness Center Modernization - Geotechnical Report + J25 Archaeological Inadvertent Discovery Plan + J27 Wage Determination OR20230069 dated 09062024 (Heavy) + J28 Wage Determination OR20240093 dated 09062024 (Building) +
Seismic Rehabilitation of the existing main station located at 189 N. Main Street, Jefferson, OR. Project scope of work includes but is not limited to Selective Demolition, CIP Concrete Footings/Walls, Concrete Reinforcing, Shotcrete Shear Walls, CMU In-Fills, Structural Steel, Misc. Steel, Rough Carpentry, Finish Carpentry, Insulation, Membrane Roofing, Sheet Metal, Fiber Cement Siding, Windows, Sectional Doors, Man Doors/Frames/Hardware, Drywall, Acoustical Ceilings, Flooring, Painting, Casework, Seismic Bracing, Plumbing, Electrical and General Excavation.
Plans + Specs + Project Manual +
New 4,900 sf facility to house art programming in Larkspur Park. The building will provide year-round community activities & programs for preschool & school age children, teens, adults, seniors & families. The building will have three classroom spaces including one clay studio with adjacent kiln room. Office, workroom, restrooms, & support spaces are also accommodated. The project includes the furnishings, fixtures, support equipment, and associated site-work & utilities.
Bend Art Station Specs + Bend Art Station Plans + Bend Art Station Addenda 1 + Bend Art Station Addenda 2 +
10,000 sf Aviation Maintenance Technology and Training Facility to be operated by CGCC. Will consists of a two-bay aviation shop, training rooms, offices for staff & support functions, storage and equipment space and a pre-engineered metal building that is fully sprinklered.
Plans + Specs + Addendum 1 + Addendum 2 + Addendum 2 Plans + Memo 1 + Memo 2 + Memo 3 +
The scope of work consists of a new administrative office building (6,825sf), fire shop building (4,251sf), and associated parking. Both buildings will be type V-B wood construction and fully sprinklered. The structure will be a category 4 seismic strength. The existing site contains a fire cache & workshop building (to be demolished), a seedling and refrigeration building, a high-bay shop building, and the former site of the administrative building that was burnt down in 2020. The associated septic systems are poised to be decommissioned as well.
Invitation to Bid + Plans + Specs + Addendum 1 + Addendum 2 + Addendum 3 + Addendum 4 + Q&A 1 + Q&A 2 + Q&A 3 + Q&A 4 + Substitution Request 1 + Substitution Request 2 + Substitution Request 3 + Substitution Request 4 + Substitution Request 5 + Substitution Request 6 + Pre-Bid Conference Attendee List +