[ Back ]

Project Gallery

Imbler High School Seismic Rehabilitation

Imbler, OR

May 2018 - August 2018

Original Contract Amount: $1.2M

OWNER: Imbler School District

ARCHITECT: ZCS Engineering and Architecture

PROJECT DESCRIPTION:  Seismic retrofit including the rehabilitation to the existing lateral system components in order to meet the requirements for Life Safety as outlined in ASCE 41-13. Accomplished by adding to or altering the existing structure and lateral load path to the building foundation.